MARPOL ANNEX 4 Explained: How to Prevent Pollution from Sewage at Sea
It is said that waste management on board ship is technically a full-time job for the ship’s crew. The waste produced by some types of ships can go in thousands of tons on daily basis.
This waste can be divided into operational generated waste such as oil waste, air pollution, cargo residue etc. and human-generated waste such as garbage and sewage.
The sewage waste produced by a ship depends on the number of crew members and the type of ship. A large cruise ship can produce about 170,000 gallons of sewage on a daily basis. On an average of 0.01 to 0.06 m3 of sewage is produced per person in a day.
Related Read: Ocean Pollution: 6 Things That Make It Worse
Defining Sewage Waste
The Sewage waste produced on the ship can further be divided into two categories; Blackwater and Grey Water.
Together they are called as wastewater.
The black water comprises the following wastes produced on a ship:
– Waste generated from drainage and in any other form from toilets and urinals
– Waste generated from the drainage of a medical dispensary, sickbay, etc. via washbasins, washtubs and scuppers located in such premises
– Drainage from the cargo hold of living animals; or other wastewaters when mixed with the drainages of such spaces
The Grey Water produced on Ship comprises of:
– Waste generated from the drainage of dishwasher and washbasin in the galley
– Waste generated from the drainage of cabin showers, bath and washbasin drains
– Waste generated from the drainage of laundry
– Wastewater from interior deck drains
– Refrigerator and air conditioner condensate
The untreated sewage contains a concentration of nitrates, phosphates and organic matters. This will contaminate the water bodies such as lakes, rivers, and the sea as the bacteria in the untreated sewage are strong and can consume oxygen at a very high rate from the surroundings, making it difficult for the natural fauna of the aquatic environment to sustain.
Related Read: Marine Pollution by Ships -Tips for Reducing & Recycling Waste at Sea
Regulation For Sewage Waste – MARPOL ANNEX IV
The sewage waste discharge from the ship is regulated under MARPOL Annex IV. The regulation states that:
– Every ship of 400 GT and above which is engaged in international voyages, and carrying minimum 15 persons onboard must be equipped with either a sewage holding tank of appropriate capacity or an approved sewage Treatment Plant (STP) or both
– The sewage discharge from the ship is allowed if it has an approved sewage treatment plant, which can treat the raw sewage and discharge comminuted and disinfected sewage. With this arrangement, the discharge is allowed at a distance of more than 3 nautical miles from the nearest land when the ship is proceeding with a speed of 4 knots and above
– Foreign going cargo ships may be allowed (depending upon the area they are plying) to discharge untreated sewage only at a distance greater than 12 nautical miles from the closest land only if the ship is proceeding with a speed of 4 knots and above
– The ship has to maintain the rate of discharge of the sewage from the ship as recommended by the administration
– The rate of discharge from the ship is also limited to 1/200,000 (or one 200,000th part) of swept volume as follows:
DRmax = 0.00926 V D B
Where:
DRmax is maximum permissible discharge rate (m3/h)
V is ship’s average speed (knots) over the period
D is Draft (m)
B is Breadth (m)
Special Areas:
The most recent amendment for MAPOL annexe IV was enforced in January 2013, wherein, the Baltic sea area has been adopted as the first special area for sewage discharge regulation. This regulation targets passenger ships, which are the major cause of sewage-related pollution at sea and in coastal water bodies.
This regulation bans the discharge of untreated sewage out at sea in the Baltic area region. The untreated “raw” sewage produced on the ship can either be treated in an STP before discharge or the collected sewage can be transferred to the shore facility.
The sewage treatment plant installed on a passenger ship, intending to discharge sewage effluent in Special Areas, should additionally meet the nitrogen and phosphorus removal standards when tested for its Certificate of Type Approval by the Administration.
Related Read: 4 Important Terms Related to Sewage Treatment Plant on Ships
The discharge requirements for Special Areas in regulation 11.3 of MARPOL Annex IV for the Baltic Sea Special Area shall take effect:
1. On 1st June 2019, for new passenger ships i.e. Building contract placed on or after 1st June 2019 or delivered after 1st June 2021
2. On 1st June 2021, for existing passenger ships other than those specified in point 3
3. Two-year extension period for existing passenger ships i.e. from 1st June 2023, which are en route directly to or from a port located outside the special area and to or from a port located east of longitude 28˚10′ E within the special area that do not make any other port calls within the special area (direct passages between St. Petersburg area and the North Sea)
Shortcomings in MARPOL Annex IV Sewage Regulation
– MARPOL Annex IV does not address those vessels carrying fewer persons, which can be ships and ferries plying in domestic waters. However, there are several smaller vessels around which are discharging wastewaters that are not subject to these legal regulations
– Tourism/recreational vessels such as yachts and small boats are also not covered under the MARPOL regulation. In fact, such vessels contribute to a good percentage of marine pollution, especially in countries with a high number of tourists
Arrangement to Treat Sewage On Ships:
In all seagoing vessels, there are special arrangements installed to hold or treat the sewage (before discharging out), especially in special areas or when the ship nears the coastal areas. Following are the arrangement provided on the ship to hold or treat the sewage:
1. Holding Tank: The holding tank is usually fitted irrespective of the treatment equipment available on the ship. The operation of the ship, its voyage and the total number of crew onboard ships are taken into account to determine the capacity of the sewage holding tank. The holding tank shall have a means to visually indicate the amount of its contents.
2. Comminuting and disinfecting equipment: Ships can have the equipment, which comprises of grinder-cum-filter that breaks the sewage into smaller particles. The filter separates the solids and liquids from the “grinded” sewage. Chemical treatment is done to disinfect the “grinded” sewage sludge (solid), which is then retained in a small tank. The liquid effluent which is separated from the sewage is disinfected using chemicals, which are again filtered using fine filters. The liquid effluent which is free from solids and any bacteria can be re-used for flushing of the toilets. The solid sludge is then given to the shore retention facility.
3. STP: A ship can also be fitted with an approved sewage treatment plant (the most common type uses biological or aerobic digestion based system). The biggest advantage of using STP is that the effluent and treated sewage can be discharged anywhere into high seas.
Related Read: Starting and Stopping of Sewage Treatment Plant on a Ship
Most Common Issues With Sewage System:
The ship may be fitted with a sewage holding tank or a sewage treatment plant to comply with the MARPOL Annex IV norms. Following are the most common problems faced by the ships’ crew while using the sewage system:
- Failing of the downstream equipment due to the accumulation of solids, human hair, and other particles/items which are flushed in the toilet
- This debris may also increase the wastage of the internal surface of the pipes, especially at the bends, thus blocking the line
- Frequent chocking of screen filter due to improper operation at the source i.e. in-cabin toilets by throwing papers, rags, plastics, tin etc. in the pot, which is non-biodegradable in nature and a host for the solids to accumulate
- In the case of vacuum plant, loss of vacuum in the system is very common which may happen due to the pipe or valve leakages
- The STP with a vacuum system is provided with ejectors to create a drop in pressure. The ejector pump can become inactive as its nozzle may get blocked, thus hampering the operation
- The sewage pipes, which carry the raw sewage to the holding tank or to the STP are liable to corrosion and wastage. This may lead to getting stuck, affecting the whole operation of the sewage system
- The biological plant or aerobic digestion based system operates due to the presence of bacteria, which helps in decomposing the raw sewage. If proper care is not taken, for e.g the blower is not providing air or chemical or an unapproved cleaning agent is used in the cabin toilet, it may lead to the killing of the bacteria
- The discharge pump is fitted with level sensors, which autostart or stops the pump at the appropriate level. The mechanical level controller tends to face issues as solids and debris will collect over the float, making it inoperational and not allowing the pump to start or stop
- If the chamber is not properly maintained, it may generate a foul smell (similar to rotten eggs), indicating the tank is turning anaerobic
- Before discharging the “treated” effluent from the sewage treatment plant, it is disinfected in the chlorinating chamber. Usually, it is either done by a dosing pump connected to the chlorine tank or manually dosing by using chlorine tablets. This can be overlooked sometimes, leading to a decrease in the chlorine content of the effluent. Typical chlorine levels at discharge are 5 ppm.
Related Read: Maintenance and Checks for Sewage Treatment Plant on Ship
One of the biggest reasons for the problem in the sewage treatment plant is “an untrained crew”. It may happen that some of the crew members had experienced only of holding tanks from there previous ships and the current ship has a biological STP.
The master should ensure all the ship staff is trained on do’s and don’t of using the toilet (for e.g., not putting any non-biodegradable things, not cleaning the toilets with unapproved chemicals or washing powders etc.)
What PSC inspects in sewage system?
Whenever a ship arrives in a port, an inspector representing the port state may inspect the ship for any deficiency. The most targeted area by any PSC authority is the ship’s pollution prevention system, which also includes the sewage system.
The PSC surveyor may check the following things:
1. STP is operated correctly by the ship’s crew
2. All the crew members know the international and local regulations
3. The sewage discharge valve is shut and sealed/locked in port
4. The internal chamber of STP is clean (no sign of metal wastage)
5. The safety management system onboard includes the steps for regular checks and maintenance of the sewage plant
6. The chlorine content in the effluent can be checked
7. Log of opening and closing of the discharge valve
8. The validity of the International Sewage Pollution Prevention Certificate
Related Read: Top 10 Things Port State Control Inspector Can Check in the Engine Room
Those ships which are not fitted with sewage treatment plant do have a holding tank as a minimum requirement under MARPOL.
With a period of time, the tank will mostly have solid sludge which needs to be disposed at the shore. This is done by using international discharge connection (for sewage, sludge and bilge) from the ship-to-shore reception facility. A pipeline from the holding tank is provided to the connection with an isolating valve.
The dimension of a standard discharge connection is as follows:
Outer Diameter (OD) – 215mm,
Pro Circle Diameter (PCD) – 183mm
Thickness – 20mm
Six 22Ø holes for six 20Ø bolts with suitable length.
You might also like to read:
- Sewage Treatment Plant on Ships Explained
- 4 Important Terms Related to Sewage Treatment Plant on Ships
- Safety of Life at Sea (SOLAS); The Ultimate Guide
- MARPOL Annex 1 Explained: How To Prevent Pollution From Oil At Sea
- MARPOL (The International Convention for Prevention of Marine Pollution For Ships): The Ultimate Guide
Disclaimer: The authors’ views expressed in this article do not necessarily reflect the views of Marine Insight. Data and charts, if used, in the article have been sourced from available information and have not been authenticated by any statutory authority. The author and Marine Insight do not claim it to be accurate nor accept any responsibility for the same. The views constitute only the opinions and do not constitute any guidelines or recommendation on any course of action to be followed by the reader.
The article or images cannot be reproduced, copied, shared or used in any form without the permission of the author and Marine Insight.
About Author
Raunek Kantharia is a marine engineer turned maritime writer and entrepreneur. After a brief stint at the sea, he founded Marine Insight in 2010. Apart from managing Marine Insight, he also writes for a number of maritime magazines and websites.
Do you have info to share with us ? Suggest a correction
Latest Maritime law Articles You Would Like:
Latest News
- What are Logistics Risks?
- How Port and Terminal Operators Can Control Emissions?
- Minimum Quantity Commitment (MQC) and Liquidated Damages in Container Shipping: Concept and Relevance
- The Essential Guide to Shipping Container Dimensions – What You Need to Know
- A Comprehensive Overview of IMDG Code for Shipping Dangerous Goods
- Nautical Law: What is UNCLOS?
Subscribe To Our Newsletters
By subscribing, you agree to our Privacy Policy and may receive occasional deal communications; you can unsubscribe anytime.
Web Stories
Reminders to Master,officers and crew onboard- never use toilet cleaning chemicals that kills Aerobic Bacteria..Aerobic Bacteria helps to digest solid sewage wastes…
What does the regulation say in regards to extended anchorage periods,as we cant discharge even treated sewage overboard,and holding tanks cant store more than 10days in most ships.
Is there a ratio of size in gallons to waste before treatment, to waste after treatment?
If a cruise ship is carrying 3000 passengers & crew for 7 days. Is there a ratio of their
waste collected to what is there after treatment? How much is the waste reduced?
Where does MARPOL say that sewage treated by approved type STP cannot be discharged at port?
Between point 1.1 and 1.2 of “Regulation 11 – Discharge of sewage” there is OR present so discharge is allowed when sewage is comminuted and disinfected 3 miles away from shore OR ship is fitted with approved type STP
Some authorities though may say not to do that on their land (like in Great Lakes) but in general there is no such a rule so PSC surveyor rarely can check if sewage discharge valve is sealed.
PLEASE COMMENT THIS
1. As per MARPOL Annex IV, Grey waters are not part of sewage, as stated in section “Defining sewage waste”; and
2. As correctly commented by joozwa above, there is not any provision in MARPOL Annex IV, prohibiting the discharge of TREATED (by an approved STP) sewage at ports or within 3 n.m from nearest land.
What usually happened to a ship that caught discharging
sewage while at port
Please provide a reference for the diagram of comminuting and disinfecting system. I have never seen such a system in the marine industry.